From the Attachments & Notes tab, you can:
Image RemovedAuf der Registerkarte Anhänge & Notizen können Sie:
Image Added
Adding Notes and Changing the Scheduled DateTo communicate with your clients about work orders, we recommend using Notes. This is beneficial so your clients are clear on exactly what is happening with each work order, and so your clients can also communicate with you on any issues that may delay your activities onsite.
You can also update the Scheduled Date when you cannot make it onsite by the original date set on the work order. Note that work orders that are not rescheduled will appear in red on both your list and your client's listHinzufügen von Notizen und Ändern des geplanten Datums
Um mit Ihren Kunden über Service-Aufträge zu kommunizieren, empfehlen wir die Verwendung von Notizen. Dies ist von Vorteil, damit Ihre Kunden genau wissen, was mit den einzelnen Arbeitsaufträgen geschieht, und damit Ihre Kunden auch mit Ihnen über alle Probleme kommunizieren können, die Ihre Aktivitäten vor Ort verzögern könnten.
Sie können das geplante Datum auch aktualisieren, wenn Sie zum ursprünglich auf dem Arbeitsauftrag festgelegten Datum nicht vor Ort sein können. Beachten Sie, dass Service-Aufträge, die nicht verschoben werden, sowohl in Ihrer Liste als auch in der Liste Ihres Kunden in Rot erscheinen.
Warning |
---|
Tip |
---|
You may also add a note to multiple work orders. See Adding Notes and Changing the Scheduled Date in Batch for more information. |
When you do not adjust the Scheduled Date to reflect the actual time your company will arrive onsite, it will be marked negatively in your Contractor Scorecard. See Contractor Scorecard for more information. |
|
Wenn Sie das geplante Datum nicht an die tatsächliche Ankunftszeit Ihres Unternehmens vor Ort anpassen, wird dies in Ihrer Scorecard für Auftragnehmer negativ vermerkt. Weitere Informationen finden Sie unter Scorecard für Auftragnehmer. |
Adding NotesHinzufügen von Notizen
HTML Comment |
---|
|
LOCALIZABLE PART STARTS HERE |
Panel |
---|
bgColor | #F9F9F9 |
---|
titleColor | #0e3367 |
---|
titleBGColor | #EAEAEA |
---|
borderStyle | none |
---|
title | ⦿ How to Add a Note to a Work Order from the Work Order List |
---|
| From the Work Orders list screen, located the desired work order, and then click Add Notes.
In the Notes text box, enter the details of the note.
(Optional) Check the Action Required box to alert recipients to take further action on a work order.
(Optional) Inside the Add Addressee(s) box, type or select the name(s) of the people you wish to copy to the note.
(Optional) Click the Select a File button, to add, up to 5 attachments with brief descriptions.Click Save and Send Note to complete the processWie man einem Service-Auftrag aus der Auftragsliste eine Notiz hinzufügt |
|
- Suchen Sie auf dem Bildschirm mit der Liste der Service-Aufträge den gewünschten Service-Auftrag und klicken Sie auf Notizen hinzufügen.
Geben Sie in das Textfeld Notizen die Details der Notiz ein. (Optional) Aktivieren Sie das Kontrollkästchen Erforderliche Maßnahme, um die Empfänger darauf hinzuweisen, dass sie weitere Maßnahmen für einen Service-Auftrag ergreifen müssen. (Optional) Geben Sie im Feld Adressat(en) hinzufügen die Namen der Personen ein, die Sie in die Notiz kopieren möchten, oder wählen Sie diese aus. (Optional) Klicken Sie auf die Schaltfläche Datei auswählen, um bis zu 5 Anhänge mit kurzen Beschreibungen hinzuzufügen. - Klicken Sie auf Speichern und Notiz senden, um den Vorgang abzuschließen.
|
HTML Comment |
---|
|
LOCALIZABLE PART ENDS HERE |
Panel |
---|
bgColor | #F9F9F9 |
---|
titleColor | #0e3367 |
---|
titleBGColor | #EAEAEA |
---|
borderStyle | none |
---|
title | ⦿ How to Add a Note to a Work Order from the Detailed View |
---|
|
- In the detailed view of the desired work order, under the Attachments & Notes tab, click Add Note/Update Schedule Date. The Note <#> for <WO #> window opens.
- Enter your notes in the Notes text box.
- (Optional) Check the Action Required box.
- (Optional) Inside the Add Addressee(s) box, type or select the name(s) of the people you wish to copy to the note.
- (Optional) Check the Send a Copy to Myself box, and (when not available) enter desired email in the My Email box.
- (Optional) Add an attachment:
- In the bottom of the Note <#> for <WO #> window, in the Add Attachment section, click Select a File.
- Browse to the location of the desired file, and click Choose. The selected file appears in the Notes window.
- Enter a brief description about the attachment.
- Repeat steps 7a - 7c to add up to 5 files.
- Click Save and Send Note. The note details display in the Attachments & Notes tab. The selected recipients receive email notifications.
|
Tip |
---|
When you receive an email notification about a note added to a work order, you can add a new note from the email. In the email, you can see the last and the last but one added note (if any).
Expand |
---|
title | Click here to find out how to create a note from an email alert about a new noteWie man einem Service-Auftrag in der Detailansicht eine Notiz hinzufügt |
|
---|
- Klicken Sie in der Detailansicht des gewünschten Service-Auftrags unter der Registerkarte Anhänge & Notizen auf Notiz hinzufügen/Planungsdatum aktualisieren. Das Fenster Notiz <#> für <SA #> wird geöffnet.
- Geben Sie Ihre Notizen in das Textfeld Notizen ein.
- (Optional) Markieren Sie das Feld Aktion erforderlich.
- (Optional) Geben Sie im Feld Adressat(en) hinzufügen die Namen der Personen ein, die Sie in die Notiz kopieren möchten, oder wählen Sie diese aus.
- (Optional) Aktivieren Sie das Kontrollkästchen Kopie an mich selbst senden und (falls nicht verfügbar) geben Sie die gewünschte E-Mail in das Feld Meine E-Mail ein.
- (Optional) Fügen Sie einen Anhang hinzu:
- Klicken Sie im unteren Bereich des Fensters Notiz <#> für <WO #> im Abschnitt Anlage hinzufügen auf Datei auswählen.
- Navigieren Sie zum Speicherort der gewünschten Datei und klicken Sie auf Auswählen. Die ausgewählte Datei wird im Fenster Notizen angezeigt.
- Geben Sie eine kurze Beschreibung der Anlage ein.
- Wiederholen Sie die Schritte 7a - 7c, um bis zu 5 Dateien hinzuzufügen.
- Klicken Sie auf Speichern und Notiz senden. Die Details der Notiz werden auf der Registerkarte Anhänge & Notizen angezeigt. Die ausgewählten Empfänger erhalten E-Mail-Benachrichtigungen.
|
Tip |
---|
Wenn Sie eine E-Mail-Benachrichtigung über eine zu einem Service-Auftrag hinzugefügte Notiz erhalten, können Sie aus der E-Mail heraus eine neue Notiz hinzufügen. In der E-Mail können Sie die letzte und die vorletzte hinzugefügte Notiz sehen (falls vorhanden). Expand |
---|
title | Klicken Sie hier, um herauszufinden, wie Sie eine Notiz aus einer E-Mail-Benachrichtigung über eine neue Notiz erstellen können. |
---|
|
Panel |
---|
bgColor | #F9F9F9 |
---|
titleColor | #0e3367 |
---|
titleBGColor | #EAEAEA |
---|
borderStyle | none |
---|
title | ⦿ How to Add a Note to a Work Order from an Email Alert about a New Note |
---|
| Click Create New Note in the email. You are prompted to log in to Provider Automation if you are not logged in. Image RemovedYou land on the Work Orders List where you can add a new note to the service requestWie man einen Hinweis zu einem Service-Auftrag aus einer E-Mail-Benachrichtigung über einen neuen Hinweis hinzufügt |
| - Klicken Sie in der E-Mail auf Neue Notiz erstellen. Sie werden aufgefordert, sich bei der Dienstleister Anwendung anzumelden, wenn Sie nicht angemeldet sind.
Image Added
- Sie landen auf der Liste der Service-Aufträge, wo Sie eine neue Notiz zu dem Service-Auftrag hinzufügen können.
---ORODER--- Reply to the email, and type your note in the reply.Send the email.
Note |
---|
Ensure the original message is included in the reply. | The client gets an email notification about a new note added to the work order
- Antworten Sie auf die E-Mail und geben Sie Ihre Notiz in der Antwort ein.
Senden Sie die E-Mail. Note |
---|
Stellen Sie sicher, dass die ursprüngliche Nachricht in der Antwort enthalten ist. |
Der Kunde erhält eine E-Mail-Benachrichtigung über eine neue Notiz, die dem Arbeitsauftrag hinzugefügt wurde. |
|
|
Anchor |
---|
| UpdateSchedDate |
---|
| UpdateSchedDate |
---|
|
Updating Scheduled DatesUpdating the Scheduled Date on work orders is imperative for communication with your clients. By doing so, your clients know when they should expect you onsite to repair the issue, in line with your current service level agreements. Should you need to reschedule — say, due to weather, material shortage, technician shortage, or other reasons — you may do so on the work order within Provider Automation.
Projected Completion Date
In addition to scheduled date for a work order, some clients may also require you to enter a projected completion date for the work order, which is the date/time when you expect the work to be complete. When you are required to enter this information, Projected Completion Date field will appear when updating a work orderVoraussichtliches Fertigstellungsdatum
Die Aktualisierung des geplanten Termins auf Arbeitsaufträgen ist für die Kommunikation mit Ihren Kunden unerlässlich. Auf diese Weise wissen Ihre Kunden, wann sie damit rechnen müssen, dass Sie vor Ort sind, um das Problem zu beheben, und zwar im Einklang mit Ihren aktuellen Servicevereinbarungen. Sollten Sie den Termin verschieben müssen - z. B. wegen des Wetters, Materialmangels, Technikermangels oder aus anderen Gründen - können Sie dies auf dem Service-Auftrag in der Dienstleister Anwendung vermerken.
Geplantes Abschlussdatum
Zusätzlich zum geplanten Datum für einen Service-Auftrag verlangen manche Kunden auch die Eingabe eines voraussichtlichen Fertigstellungsdatums für den Service-Auftrag, d. h. das Datum/die Uhrzeit, zu dem/der die Arbeit voraussichtlich abgeschlossen sein wird. Wenn Sie diese Informationen eingeben müssen, erscheint beim Aktualisieren eines Arbeitsauftrags das Feld Voraussichtliches Fertigstellungsdatum.
Warning |
---|
Note |
---|
Some clients may have a limit on the maximum number of times a work order can be rescheduled to a later date. Should one or more of your clients have this setting, when you have rescheduled a work order the maximum number of times, you will get a warning message. Should you try to reschedule the work order after this, the status changes to Open/Declined, and the work order is automatically reassigned to a different service provider |
When you do not adjust the Scheduled Date to reflect the actual time your company will arrive onsite, it will be marked negatively in your Contractor Scorecard. See Contractor Scorecard for more information. |
|
Wenn Sie das geplante Datum nicht an die tatsächliche Ankunftszeit Ihres Unternehmens vor Ort anpassen, wird dies in Ihrer Scorecard für Auftragnehmer negativ vermerkt. Weitere Informationen finden Sie unter Scorecard für Auftragnehmer. |
Note |
---|
Bei einigen Kunden kann die maximale Anzahl der Verschiebungen eines Service-Auftrags auf ein späteres Datum begrenzt sein. Sollte einer oder mehrere Ihrer Kunden diese Einstellung haben, erhalten Sie eine Warnmeldung, wenn Sie einen Service-Auftrag so oft wie möglich verschoben haben. Sollten Sie danach versuchen, den Service-Auftrag erneut zu verschieben, ändert sich der Status in Offen/Abgelehnt, und der Auftrag wird automatisch einem anderen Dienstleister zugewiesen. |
HTML Comment |
---|
|
LOCALIZABLE PART STARTS HERE |
Panel |
---|
bgColor | #F9F9F9 |
---|
titleColor | #0e3367 |
---|
titleBGColor | #EAEAEA |
---|
borderStyle | none |
---|
title | ⦿ How to Change the Scheduled Date on Work Orders from the Work Order List |
---|
| Image Removed
On the desired work order on the Work Orders List, click Add Note. The Note (x) for (Tracking Number x) modal appears.Enter a Note explaining why you are rescheduling.Choose a new Scheduled Date using the calendar picker, and enter a new time (in military time).Choose the appropriate Reschedule Reason, such as Weather, Vendor Requested, or Material Shortage.
(When requested by your Client) Enter the Projected Completion Date indicating the estimated date and time when the work will be complete.(Optional) Select the desired recipient(s) in the To Send Email Select Addressee(s) list.(Optional) Check the Send a Copy to Myself box.Click Save and Send Note. The note updates on each work order selectedWie man das geplante Datum von Service-Aufträgen in der Liste der Service-Aufträge ändert |
|
Image Added - Klicken Sie beim gewünschten Service-Auftrag in der Liste der Service-Aufträge auf Notiz hinzufügen. Das Modal Notiz (x) für (Trackingnummer x) wird angezeigt.
- Geben Sie eine Notiz ein, in der Sie erklären, warum Sie den Termin verschieben.
- Wählen Sie über die Kalenderauswahl ein neues geplantes Datum aus und geben Sie eine neue Uhrzeit (in militärischer Zeit) ein.
Wählen Sie den entsprechenden Verschiebungsgrund, wie z. B. Wetter, Lieferantenwunsch oder Materialmangel. (Auf Wunsch Ihres Kunden) Geben Sie das voraussichtliche Datum und die voraussichtliche Uhrzeit an, zu der die Arbeiten abgeschlossen sein werden. - (Optional) Wählen Sie den/die gewünschten Empfänger in der Liste Adressat(en) zum Senden einer E-Mail auswählen aus.
- (Optional) Markieren Sie das Feld Kopie an mich selbst senden.
- Klicken Sie auf Speichern und Notiz senden. Die Notiz wird für jeden ausgewählten Service-Auftrag aktualisiert.
|
HTML Comment |
---|
|
LOCALIZABLE PART ENDS HERE |
Anchor |
---|
| AddNotesInBatch |
---|
| AddNotesInBatch |
---|
|
Adding Notes and Changing the Scheduled Date in Hinzufügen von Notizen und Ändern des geplanten Datums im Batch
Note |
---|
Note: You may process up to 200 work orders in a batchSie können bis zu 200 Arbeitsaufträge in einem Stapel verarbeiten. |
Panel |
---|
bgColor | #F9F9F9 |
---|
titleColor | #0e3367 |
---|
titleBGColor | #EAEAEA |
---|
borderStyle | none |
---|
title | ⦿ How to Add a Note to Work Orders in Batch from the Work Order List |
---|
| On the Work Orders List, check the boxes next to 2 or more desired work orders.On the bottom of the work order list, click Add Note. The Add Note (x Work Orders) page appears.Enter the desired comments in the Note text field.
Click Save. The note updates on each work order selectedWie man aus der Liste der Service-Aufträge eine Notiz zu den Service-Aufträgen im Batch hinzufügt |
|
- Markieren Sie in der Liste der Service-Aufträge die Kästchen neben 2 oder mehr gewünschten Aufträgen.
- Klicken Sie am unteren Ende der Liste der Service-Aufträge auf Notiz hinzufügen. Die Seite Notiz hinzufügen (x Service-Aufträge) wird angezeigt.
Geben Sie die gewünschten Kommentare in das Textfeld Notiz ein. Klicken Sie auf Speichern. Die Notiz wird für jeden ausgewählten Service-Auftrag aktualisiert.
|
Panel |
---|
bgColor | #F9F9F9 |
---|
titleColor | #0e3367 |
---|
titleBGColor | #EAEAEA |
---|
borderStyle | none |
---|
title | ⦿ How to Change the Scheduled Date on Work Orders in Batch from the Work Order List |
---|
| Image Removed
On the Work Orders List, check the boxes next to 2 or more desired work orders.On the bottom of the work order list, click Add Note. The Add Note (x Work Orders) modal appears.Enter a Note explaining why you are rescheduling.Choose a new Scheduled Date using the calendar picker, and select a new Scheduled Time (listed in military time).Choose the appropriate Reschedule Reason, such as Weather, Vendor Requested, or Material Shortage.
Click Save. The note updates on each work order selectedWie man das geplante Datum auf Service-Aufträgen im Batch von der Liste der Service-Aufträge aus ändert |
|
Image Added - Markieren Sie in der Liste der Service-Aufträge die Kästchen neben 2 oder mehr gewünschten Aufträgen.
- Klicken Sie am unteren Ende der Liste der Service-Aufträge auf Notiz hinzufügen. Das Modal Notiz hinzufügen (x Service-Aufträge) erscheint.
- Geben Sie eine Notiz ein, in der Sie erklären, warum Sie den Termin verschieben.
- Wählen Sie über die Kalenderauswahl ein neues geplantes Datum und eine neue geplante Uhrzeit (in militärischer Zeit).
- Wählen Sie den entsprechenden Verschiebungsgrund, wie z. B. Wetter, Lieferantenwunsch oder Materialmangel.
Klicken Sie auf Speichern. Die Notiz wird für jeden ausgewählten Service-Auftrag aktualisiert.
|
Anchor |
---|
| AddAttachment |
---|
| AddAttachment |
---|
|
Adding AttachmentsYou may add up to 5 files to a work order at a time.
Tip |
You may also add an attachment to a work order through email by sending an email with the attachment to attachments@servicechannel.net with the tracking number of the work order in the email subjectHinzufügen von Anhängen
Sie können jeweils bis zu 5 Dateien zu einem Service-Auftrag hinzufügen.
Tip |
---|
Sie können einen Anhang zu einem Service-Auftrag auch per E-Mail hinzufügen, indem Sie eine E-Mail mit dem Anhang an attachments@servicechannel.net senden und die Tracking-Nummer des Service-Auftrags im Betreff der E-Mail angeben. |
Panel |
---|
bgColor | #F9F9F9 |
---|
titleColor | #0e3367 |
---|
titleBGColor | #EAEAEA |
---|
borderStyle | none |
---|
title | ⦿ How to Add a Single Attachment |
---|
| In the detailed view of the desired work order, under the Attachments & Notes tab, click Add Attachment on the left side of the panel. The Upload Attachment modal opens.Click Browse a file, browse to the location of the desired file, and then click Choose.Enter a brief description of the attachment.Click Upload. The new attachment displays in the left section of the pageWie man eine einzelne Anlage hinzufügt |
|
- Klicken Sie in der Detailansicht des gewünschten Service-Auftrags unter der Registerkarte Anhänge & Notizen auf der linken Seite des Fensters auf Anhang hinzufügen. Das Modal Anlage hochladen wird geöffnet.
- Klicken Sie auf Eine Datei durchsuchen, suchen Sie den Speicherort der gewünschten Datei und klicken Sie dann auf Auswählen.
- Geben Sie eine kurze Beschreibung der Anlage ein.
- Klicken Sie auf Hochladen. Der neue Anhang wird im linken Bereich der Seite angezeigt.
|
Panel |
---|
bgColor | #F9F9F9 |
---|
titleColor | #0e3367 |
---|
titleBGColor | #EAEAEA |
---|
borderStyle | none |
---|
title | ⦿ How to Add Multiple Attachments |
---|
| In the detailed view of the desired work order, under the Attachments & Notes tab, click Add Note/Update Schedule Date. The Note <#> for <WO #> window opens.Enter your notes in the Notes text box.In the bottom of the Note <#> for <WO #> window, in the Add Attachment section, click Select a File.Browse to the location of the desired file, and click Choose. The selected file appears in the Notes window.Enter a brief description of the attachment.Repeat steps 3 - 5 to add more files.
Note |
---|
You may add up to 5 attachments at a time. |
Click Save and Send Note. The attachments display under the Attachments & Notes tab, and a note appears with the details of the attachmentsWie man mehrere Anhänge hinzufügt |
|
- Klicken Sie in der Detailansicht des gewünschten Service-Auftrags unter der Registerkarte Anlagen & Notizen auf Notiz hinzufügen/Terminplan aktualisieren. Das Fenster Notiz <#> für <WO #> wird geöffnet.
- Geben Sie Ihre Notizen in das Textfeld Notizen ein.
- Klicken Sie im unteren Bereich des Fensters Notiz <#> für <SA #> im Abschnitt Anlage hinzufügen auf Datei auswählen.
- Navigieren Sie zum Speicherort der gewünschten Datei und klicken Sie auf Auswählen. Die ausgewählte Datei wird im Fenster Notizen angezeigt.
- Geben Sie eine kurze Beschreibung der Anlage ein.
- Wiederholen Sie die Schritte 3 - 5, um weitere Dateien hinzuzufügen.
Note |
---|
Sie können bis zu 5 Anhänge auf einmal hinzufügen. |
- Klicken Sie auf Speichern und Notiz senden. Die Anhänge werden auf der Registerkarte Anhänge und Notizen angezeigt, und es erscheint eine Notiz mit den Details der Anhänge
|
Anchor |
---|
| DeleteAttachment |
---|
| DeleteAttachment |
---|
|
Deleting an AttachmentIn case an attachment is not required, you may also delete it from the Attachments & Notes tab. Note that attachments added can be deleted only by the user who added themLöschen eines Anhangs
Falls ein Anhang nicht benötigt wird, können Sie ihn auch auf der Registerkarte Anhänge & Notizen löschen. Beachten Sie, dass hinzugefügte Anhänge nur von dem Benutzer gelöscht werden können, der sie hinzugefügt hat.
Panel |
---|
bgColor | #F9F9F9 |
---|
titleColor | #0e3367 |
---|
titleBGColor | #EAEAEA |
---|
borderStyle | none |
---|
title | ⦿ How to Delete an Attachment |
---|
| In the detailed view of the work order, under the Attachments & Notes tab, click the Delete icon next to the desired attachment. The attachment is removed, and note displays indicating the attachment was deleted.
Note |
In case an attachment was added through the Invoice module, only the user who added the attachment can delete it. The Delete icon next to a file added through the Invoice module is greyed out for all other usersWie man einen Dateianhang löscht |
|
Klicken Sie in der Detailansicht des Service-Auftrags auf der Registerkarte Anhänge & Notizen auf das Symbol Löschen neben dem gewünschten Anhang. Die Anlage wird entfernt, und es wird ein Hinweis angezeigt, dass die Anlage gelöscht wurde. Note |
---|
Wenn ein Anhang über das Rechnungsmodul hinzugefügt wurde, kann nur der Benutzer, der den Anhang hinzugefügt hat, diesen löschen. Das Symbol Löschen neben einer Datei, die über das Rechnungsmodul hinzugefügt wurde, ist für alle anderen Benutzer ausgegraut. |
|
Anchor |
---|
| NoteSplittingSystemNotes |
---|
| NoteSplittingSystemNotes |
---|
|
Splitting Notes for System NotesNote Splitting for System Notes occurs when a user makes a manual and system note change on a specific work order simultaneously. For example, creating a manual note and changing the work order status, the notes are split into Manual or System. Note Splitting for System Notes also occurs when clients make manual and system note changes at the same time on a specific work order.
Image RemovedAufteilung von Notizen für Systemnotizen
Die Aufteilung von Notizen für Systemnotizen erfolgt, wenn ein Benutzer gleichzeitig eine manuelle und eine Systemnotiz für einen bestimmten Service-Auftrag ändert. Wenn beispielsweise eine manuelle Notiz erstellt und der Status des Arbeitsauftrags geändert wird, werden die Notizen in Manuell oder System aufgeteilt. Notizsplitting für Systemnotizen tritt auch auf, wenn Kunden gleichzeitig manuelle und Systemnotizänderungen an einem bestimmten Arbeitsauftrag vornehmen.
Image Added