Proposals are sent by service providers detailing the costs and materials involved to complete specified work. Managing these proposals in SC Mobile helps you save time during the reviewing and action-taking process. When a service provider submits a proposal, you may take the following actions:

  • approve a proposal;
  • place a proposal on hold;
  • reject a proposal; and
  • assign the proposal to another person in your organization.

You may review proposal lists either for one location or across all locations for which you have access. Within those lists, you may filter proposals by status, assignment, priority, category, and/or trade.

Note

Users with the the "Proposals: Process" or and "Proposals: Full Control" permissions may can take action on Proposals proposals in SC Mobile.

Proposal Details in SC MobileImage RemovedViewing proposal details in SC MobileImage Added

Standalone Proposals Versus Proposals Linked to a Work Order

There are two types of Proposals:

  • Standalone Proposals are not tied to a work order. Once the proposal is accepted, a work order is generated.
    • For example: A service provider may create a standalone proposal while tending to their planned maintenance work order (say, a proposal for HVAC repair while the provider was performing filter maintenance). Also, you may see standalone proposals from RFPs generated from you or your internal team, such as for CapEx projects.
    • In SC Mobile you will see “(No WO Associated)” on the Proposal, as depicted above.
  • Proposals Associated With a Work Order are generated from an existing work order. This typically occurs when a service provider is already working on a repair, but the scope of work has increased or work will cost more than the NTE.
    • For example: A service provider is fixing a roof, based on the work defined in a work order. The NTE is for $1500, but the scope of work increases the costs to $1700. You may request the service provider to submit a proposal based on that existing work order.

Accessing and Viewing Proposals

In SC Mobile you can view proposals from the Location, the linked Work Order, or from the Proposals list:

From the a Location

Image RemovedImage Added

Looking up a Location and then tapping Proposals list all open proposals for that location.

For each Proposal you see an overview of the Cost, Trade, Provider, and Description, as well as whether it is linked to a Work Order.

Panel
bgColor#F9F9F9
titleColor#0e3367
titleBGColor#EAEAEA
borderStylenone
title⦿ How to View Proposal for a Location
  1. Locate and tap the desired location.
  2. Tap the Proposals tab. The list of Proposals for that Location appears.
  3. Tap the desired proposal. The Proposal Details appear.

From here, you may view the proposal details and take action on the proposal.


From a linked work order:

Proposals linked to a work orderImage RemovedImage Added

On the Work Order Details the proposal is listed under Related Proposals.

You can see what status the Proposal is in (Open, On Hold, Rejected, or Accepted) along with the Proposal number.

Panel
bgColor#F9F9F9
titleColor#0e3367
titleBGColor#EAEAEA
borderStylenone
title⦿ How to View a Proposal From an Associated Work Order
  1. Locate and tap the desired work order. The Work Order Details appear.
  2. Under Related Proposals, tap the Proposal Link. The Proposal Details appear.

From here, you may view the proposal details and take action on the proposal.


From the Proposal proposals list:

Proposals listImage RemovedImage Added

Here, you will see a list of all open Proposals for all locations to which you have access.

You will see an overview of the Cost, Trade, Provider, and Description, as well as whether it is associated with a Work Order.

Panel
bgColor#F9F9F9
titleColor#0e3367
titleBGColor#EAEAEA
borderStylenone
title⦿ How to View the Proposal List
  1. From the SC Mobile Home Page (or from the hamburger menu), tap Proposals. The list of open Proposals appears.
  2. Tap the desired proposal. The Proposal Details appear.

From here, you may view the proposal details and take action on the proposal.


Anchor
viewproposaldetails
viewproposaldetails
Viewing the Proposal Details

On the Proposal Details, you will see a description of the project as well as a breakdown of costs: materials, installation labor, non-installation expenses, freight, tax, costs incurred, and the total cost for the proposal. You will also see any attachments uploaded with the proposal. (Note: When there are no attachments you will not see this field.)

Panel
bgColor#F9F9F9
titleColor#0e3367
titleBGColor#EAEAEA
borderStylenone
title⦿ How to View Proposal Details
  1. After locating the desired Proposal, tap each line item to review more details. (Note: When there is a zero (0.00) cost on a line item, the line will not expand.)
    Proposal detailsImage RemovedViewing proposal details in SC MobileImage Added

Anchor
takeactiononproposals
takeactiononproposals
Taking Action on Proposals

Once your proposal is reviewed, you may take the appropriate action.

Note

Accepted proposals must be associated with a work order. For standalone proposals, you will create a new work order at the time of accepting the proposal. For linked proposals, you can either keep the original work order or change the work order.


Panel
bgColor#F9F9F9
titleColor#0e3367
titleBGColor#EAEAEA
borderStylenone
title⦿ How to Approve a Linked Proposal With Existing WO
  1. Locate the desired Proposal and tap Approve. A green dialog box appears.
  2. Tap Approve With Existing WO. The Existing WO page appears.
  3. Review the work order details for accuracy, and then tap Save. A green dialog box appears.
  4. Tap Reason for Approval, choose the reason for the proposal approval, and tap Save.
    Options for Approving ProposalsImage RemovedImage Added
  5. Enter a comment providing more details and tap Proceed. The existing work order is updated, and the proposal is marked as Approved.


Panel
bgColor#F9F9F9
titleColor#0e3367
titleBGColor#EAEAEA
borderStylenone
title⦿ How to Approve a Standalone or Linked Proposal With a New WO
  1. Locate the desired Proposal and tap Approve. A green dialog box appears.
  2. Tap Approve With New WO. The Create WO page appears.
  3. Enter the WO details and tap Next. A green dialog box appears.
  4. Tap Reason for Approval, choose the reason for the proposal approval, and tap Save.
  5. Enter a comment providing more details and tap Proceed. A new work order is created, and the proposal is marked as Approved. The new work order number is listed on the proposal, and you may tap it to view the details.


Panel
bgColor#F9F9F9
titleColor#0e3367
titleBGColor#EAEAEA
borderStylenone
title⦿ How to Reject a Proposal
  1. After locating the desired Proposal, tap each line item to review all details.
  2. Tap Reject. A red dialog box appears.
    Options for Rejecting ProposalsImage RemovedRejecting a proposal in SC MobileImage Added
  3. (Optional, but recommended) Enter a Reason for Rejection in the text area.
  4. Reject the proposal with or without notifying people:
    1. To reject without sending notifications:
      • Tap Proceed. The proposal is marked as Rejected.
    2. To reject and send notifications:
    • Tap Select People to Alert to send an email notification of the rejection. The Notifications page appears.
      • By default, the service provider is selected. Tap the names of listed people, and/or tap Add Email + to send notifications to unlisted people.
    • Tap Send. The proposal is marked as Rejected.


Panel
bgColor#F9F9F9
titleColor#0e3367
titleBGColor#EAEAEA
borderStylenone
title⦿ How to Place a Proposal On Hold
  1. After locating the desired Proposal, tap each line item to review all details.
  2. Tap On-Hold. The proposal is marked as On Hold.

    Putting a proposal on hold in SC MobileImage Added

    Placing Proposals On HoldImage Removed
    Tip
    Note:

    You

    may

    can take a proposal off hold by tapping On

    -

    Hold again. The icon will change back to blue

    , indicating the change

    .



Panel
bgColor#F9F9F9
titleColor#0e3367
titleBGColor#EAEAEA
borderStylenone
title⦿ How to Assign a Proposal to Another Person in Your Organization

When assigning a work order you still may be able to take action on the work order.

Note: You cannot undo a proposal assignment. Once you assign a user, you can only reassign it to another user. You cannot remove the assignment.

  1. After locating the desired Proposal, tap each line item to review all details.
  2. Tap Assign. A list of users appears.
    Assigning a proposal in SC MobileImage Added
  3. Tap the desired user, and then tap Assign. The proposal is marked as Assigned, and the user name of the assignee is listed on the proposal.
Assigned ProposalImage Removed
  1. Selecting a user to assign a proposal to in SC MobileImage Added

Anchor
filteringproposals
filteringproposals
Filtering Proposals

To help narrow down your proposal list, you may filter by Status, Assigned To, PriorityTradeProvider, and/or Category. You may also sort the list by Created Date, Trade, or Status. This is beneficial, for example, when you want to only see the proposals in the CapEx category, or open proposals, or proposals under a few, specific trades.

  • All means that no filters are applied for that section, as illustrated next to Assigned to.
  • A number indicates how many were selected, and thus applying the filter.
  • To see the full list, you must reset the filters on the bottom of the page, and then apply the change.
    • When the filters are reset, Status will return to the default 2 selections, Open and On Hold.

Proposals filters listImage RemovedFiltering proposals in SC MobileImage Added

Once filters are applied, the filters remain turned on even when you quit the app or sign out.

Applied proposal filtersImage RemovedImage Added


Panel
bgColor#F9F9F9
titleColor#0e3367
titleBGColor#EAEAEA
borderStylenone
title⦿ How to Turn On Filters
  1. On the Proposals list page, tap Filter Proposals. The Filter Proposals page appears.
  2. Tap Status, Assigned to, Priority, Trade, Provider, and/or Category to uncheck the items you do not wish to see, and then tap Apply.
  3. Tap Apply. Filter Proposals changes to Filters Applied.


Panel
bgColor#F9F9F9
titleColor#0e3367
titleBGColor#EAEAEA
borderStylenone
title⦿ How to Reset Filters
  1. On the Proposals list page, tap Filters Applied. The Filter Proposals page appears.
  2. Tap Reset, and then tap Apply. Filters Applied changes to Filter Proposals.


Live Search
spaceKeySCU
additionalpage excerpt
placeholderSearch our Knowledge Base
typepage
labelsfm

Panel
titleColor#ffffff
titleBGColor#5fa7d0
borderStylegroove
titleIn this Article

Table of Contents
maxLevel3
minLevel2
indent20px

Panel
titleColorwhite
titleBGColor#75a346
titleRelated Articles

Filter by label (Content by label)
showLabelsfalse
max8
showSpacefalse
sorttitle
cqllabel in ( "sc-mobile" , "scmobile" ) and space = currentSpace ( )