Versions Compared
Key
- This line was added.
- This line was removed.
- Formatting was changed.
The Details Tab provides location and frequency detailsspecifics. Details goes down to the work order level to provide work order creation, schedule and expiration date, along with NTE and work order service window. Here, you can view all expected planned maintenance work orders from today to 3 months in the future (by default) or by the criteria set in the all-inclusive filters along the top of the report.
You can download the data and email reports to recipients.
Data in the Visualization
The following data is listed in the report, sortable by these column headers:
Section | |||||||
---|---|---|---|---|---|---|---|
Trade Frequency: Length of work order | |||||||
Column | |||||||
| |||||||
PM ServiceID Info |
|
Anchor | ||||
---|---|---|---|---|
|
Insert excerpt | ||||||
---|---|---|---|---|---|---|
|
Live Search | ||||||||
---|---|---|---|---|---|---|---|---|
|
Panel | ||||||||
---|---|---|---|---|---|---|---|---|
| ||||||||
|
Panel | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||
|