Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The Details Tab provides location and frequency detailsspecifics.  Details goes down to the work order level to provide work order creation, schedule and expiration date, along with NTE and work order service window. Here, you can view all expected planned maintenance work orders from today to 3 months in the future (by default) or by the criteria set in the all-inclusive filters along the top of the report.

You can download the data and email reports to recipients.

Data in the Visualization

The following data is listed in the report, sortable by these column headers:

Column
width50
  • PM ServiceID
  • Location Number
  • State
  • Trade

  • Frequency: Length of work order

  • Category
  • Number of Daily Work Orders


Column
width50
  • PM ServiceID: Used instead of the tracking number when contractors use either the ServiceChannel Provider Mobile app or the IVR to check in and check out. See Adding Frequencies to Planned Maintenance Schedules for more information.

  • Location Number
  • State
  • Trade

  • Frequency
  • Category
  • Number of Daily Work Orders


Anchor
commondatafeatures
commondatafeatures

Insert excerpt
All Calls Tab
All Calls Tab
nopaneltrue

Live Search
spaceKeySCU
additionalpage excerpt
placeholderSearch our Knowledge Base
typepage

Panel
titleColor#ffffff
titleBGColor#5fa7d0
borderStylegroove
titleIn this Article

Table of Contents
maxLevel3
minLevel2
indent20px

Panel
titleColorwhite
titleBGColor#75a346
titleRelated Articles

Filter by label (Content by label)
showLabelsfalse
max8
showSpacefalse
sorttitle
cqllabel = "label" and space = currentSpace ( )